Double
 D  Rentals
 Party and Wedding  Contractor Equipment  Cart-Away Concrete
 Contact Information
Double D Rentals
1547 Hamner Avenue
Norco, CA 92860

Phone: 951-734-1040
Fax: 951-734-6587
Toll-Free:
888-546-0707
Email: Double D
 Browse Site
Rental Catalog
Homeowner & Contractor Equipment
Party, Event & Wedding Rentals
About Double D Rentals
Cart-Away Concrete
Concrete Calculator
Concrete Pouring Tips
Contact Us
Homeowner & Contractor Equipment
Linen Swatch Chart
Map and Directions
Party & Wedding
Party Rental Policy
Propane, Sand, Gravel & Other Misc.
Suggested Concrete Mix Ratios
Table Matrix
Thank You
 Store Hours
Monday - Friday
7:00am-5:30pm
Saturday
8:00am-4:30pm
Sunday
8:00am-1:00pm

Concrete Pouring Tips

 Cart-Away Concrete Ready Mixed Concrete

Cart-Away Concrete Pricing
Concrete Calculator
Concrete Pouring Tips
Suggested Mix Ratios

Concrete Pouring Tips

Even though concrete is a versatile substance it does have its limitations that you should consider. Concrete is effected by temperature, too hot and it dries with cracks, too cold and it takes forever to set-up- There are chemicals available that will allow experts to pour concrete in even the worst conditions, but trailered ready-mix is not intended for these specialized applications. But, if you make proper plans in advance you should be able to pour concrete anytime.

Most small concrete pours should be planned when the emperatures are between 60 and 90 degrees Fahrenheit. This means that the concrete will begin to set-up in a reasonable time but won’t set-up before you have a chance to finish it.

Hot Weather Tips:

  • Plan ahead. If you can make arrangements to pour in the cooler time of the day, this will minimize the effects of trying to finish the concrete in the heat.
  • Wet down all the forms and ground just before you pour in the concrete. This will reduce the rate of evaporation of the moisture in the concrete mix.
  • Avoid adding water to the mixture because it will lower the strength, increase cracking
    and reduce the durability.
  • Limit the time between placing the concrete and final finishing.
  • Use a fog type spray nozzle to maintain surface moisture and to prevent evaporating away the "bleed" water out of the concrete mix before it can be troweled smooth.
  • Provide sunshades to control the surface temperature on the exposed surfaces.
  • Erect windbreaks to reduce the chances of a dry wind that will cause the surface to cure too fast and crack.
  • As soon as the concrete is finished, begin a moist cure by keeping the finished surfaces and pour area damp for the next few days.
  • On extremely hot or windy days, it may be best to reschedule the pour for a day with more favorable conditions.

Cold Weather Tips:

  • Do not plan to pour concrete when the temperatures will not get above 60 degrees Fahrenheit.
  • If you can wait till the sun is shining on the pour site then wait.
  • Use a concrete mix with a low water volume so that will have less moisture to reduce cure time.
  • Provide a curing membrane that can be as simple as a plastic tarp or as sophisticated as a concrete curing blanket.
  • It will take longer to cure so you will want to take precautions to keep unwanted travelers from making an impression on your hard work!

Home | Products | Cart-Away Concrete | Map | Party Rental Policy | Contact Us

Site Powered by RenTrain | Edit this site
© Copyright 2003 Double D Rentals. All rights reserved.